DRAFT
Planning
Brief
Viaduct Revitalization District
Prepared for:
Prepared by:
The
Canton Planning Department has identified the Viaduct Revitalization District
as a Priority Revitalization Area (PRA) capable of redevelopment to help meet
the future employment, economic development and housing needs of
Table of Contents
1.0 Introduction
2.0 Economic
Context
3.0 Planning
4.0 Existing
Zoning and Land Use
4.1 Zoning
4.2 Land Use
4.3 Historic Sites and
Structures
5.0 The Vision
6.0 Key Objectives
7.0
Planning
and Urban Design Objectives
7.1
Uses
7.4
The Canton River
Appendix:
Viaduct Revitalization District Map
Planning Brief
Viaduct Revitalization
District
The Viaduct Revitalization
District provides
The proposed revitalization area has unequalled
local and regional location qualities. It
is in close proximity to
The Planning Department identified the Viaduct
Revitalization District as a Priority Revitalization Area (PRA) capable of redevelopment
to help meet the future employment and housing needs of
The Viaduct Revitalization
District is a major opportunity to provide a landmark office complex. This type of high quality/prestige
development, taking advantage of the riverside location and easy access to
public transportation, could serve the headquarters market (AKA Reebok,
etc.). The site location for new offices
will be a key element in the redevelopment of the Viaduct Revitalization
District.
·
The Planning Board recognizes that the timing of the provision of an
office plan is dependent on market demand.
This element of the mixed-use proposal for the area is fundamental in
achieving the Master Plan's economic development objectives.
·
Proposals put forward for the proposed Viaduct Revitalization District
should be tested against the goals, policies and key objectives of the current
Canton Master Plan Initiative.
The
proposed Viaduct Revitalization District provides
There is
4.1 Existing Zoning
The Viaduct Revitalization District is zoned
"Industrial" (I) and General Residence (GR). The "Industrial" (I) Zoning
District provides for (1) Office and
limited light manufacturing and assembly, such as electrical, medical, optical,
devices and goods, (2) warehouse and distribution facilities, (3) printing and publishing, (4) retail
stores, showrooms, salesrooms, and (5) wholesale offices and showrooms.
The General Residence Zoning District provides for
multi-family housing on lots of 217, 800 SF or more.
The Viaduct Revitalization District encompasses 54
acres of land, excluding
Of the 48 acres zoned Industrial, the Plymouth
Rubber Company occupies 40 +/- acres.
This is the largest redevelopment site in the Viaduct Revitalization
District. The remaining 8 acres of Industrial Zoned land is in four smaller
parcels, ranging from 3.48 acres to 0.8 acres. All the parcels are occupied by
light industrial, warehouse and distribution facilities.
Approximately 6 acres of land within the Viaduct
Revitalization District is zoned General Residence (GR). Of the 6 acres, 3 acres is developed with 14
single-family homes on individual lots. The single-family lots range from 5,500
square feet to 12,900 square feet. A single 3.1 acre undeveloped
parcel is included in the General Residence District.
4.3 Historic
Buildings and Structures
To the north side of the Proposed Viaduct
Revitalization District is an important and unique historical landmark, the
Canton Viaduct. Within the Plymouth
Rubber property is an important historical building, Paul Revere Barn.
5.0 The Vision
The site's close proximity to
makes it an excellent location for either office or
multi-family development. An area of such exceptional location characteristics
and qualities require a redevelopment plan of the
highest quality.
One vision for the redevelopment of this key town
area is:
"To create an exciting and attractive new riverside
development that adds to the vitality and viability of
6.0 Key Objectives
This “Vision” can be reality if the following key
objectives are achieved:
·
an overall site master plan is developed for the area and the area is redeveloped
in a comprehensive rather than a piece meal manner.
·
a mix and variety of new office and residential uses are provided within
a framework of urban and green open spaces.
·
the Town's economic development objectives are met, as set out in the
on-going Master Plan.
·
the plan is of the highest quality of site and architectural design that
creates a sense of place through the arrangement of buildings within a
framework of pedestrian ways and public open spaces, which are permanently
accessible.
·
The plan creates an attractive new riverside environment that maximizes
the opportunities to enhance the
·
The plan creates and enhances pedestrian links to
·
the plan creates a relatively vehicle free surface environment through
provision of below grade or above grade structured automobile parking.
·
opportunities to access public transportation for pedestrians, people
with mobility problems, and bicyclists are maximized.
·
The plan provides Transportation Demand Management Programs (TDM'S).
7.0
Planning
and Urban Design Requirements
This vision statement provides supplementary planning
gui
7.1 Uses
The Planning Department recommends the Viaduct Revitalization District be
redeveloped as part of a comprehensive mixed-use plan. The redevelopment plan should establish
physical links and integration with
·
flexibility will be needed to allow the area to be developed in an
integrated way.
·
The key requirement is for an integrated plan based on a clear vision of
how the redevelopment area as a whole will look and function, make use of the
riverside location and create obvious pedestrian access routes with
·
For residential dwellings, a least 15% should be “affordable”. The actual numbers of residential units that
can be provided depend on site constraints, the detailed layout, and massing arising
from the design analysis.
·
A strong landscape infrastructure that creates unity throughout the
development, including a high quality riverside walk providing a significant
area of public open space.
·
Given the proximity to
·
The plan must be of the highest order, respect Paul Revere Barn and the
Canton Viaduct, and make a significant contribution to the overall vitality,
viability and attractiveness of
·
With the exception of Paul Reveres Barn, the current buildings in the
proposed revitalization district are of no great architectural value and
actually detract from the character and appearance of the adjacent historic
Canton Viaduct and the natural beauty of the
·
The Massachusetts Department of Housing and Community Development (DHCD)
identified a shortage of affordable housing in the
·
The mix and disposition of residential an office uses needs to reflect
market requirements to ensure a commercially viable plan. The uses in the plan should avoid stand-alone
single uses but rather a mix of different uses within the revitalization
plan. The need to consider amenity and
noise/nuisance issues for existing homes in the vicinity of the site will be an
important site design consideration.
·
The integration and mix of uses will help bring more variety and vitality
than isolated stand-alone development containing a single use. Mixing of uses within buildings particularly
lends itself to riverside frontages. Specifically, commercial development on
the first floor and residential development on the second and third floors.
·
The revitalization/redevelopment area is sufficiently large to create its
own unique identity and sense of place.
·
Any revitalization/redevelopment proposals should respect the natural
environment and ecology of the
·
There are a variety of architectural styles and a wide range of possible
design solutions. The benchmark is
quality and distinctiveness. The design
must be a unique response to the site and its context.
·
There is a significant wetland habitat along the
·
Ecological surveys will be required from the outset. These surveys will help determine which areas
should be preserved and protected, and then used as a foundation for
establishing ecological enhancement opportunities to create an attractive
riverside public area.
·
The landscape infrastructure of the site will comprise both urban and
green open space and a high standard of hard and soft landscape.
·
Along the
The stretch of the
The existing riverside vegetation should be retained
and enhanced if the background ecological survey and analysis indicate that it
contributes meaningfully to the natural environment. Any prospective developer who proposes to
develop adjacent to the
The