The pile of parts, as unloaded from the truck.
Canard bulkhead, main bulkhead, main spar and keel installed in lower half of fuselage.
Carbon wrapped main gear with over-center linkage can bee seen at the rear of the fuselage. Hydraulic power pack and nose gear are at the front.
Still need to figure out what is in the rest of the pile of parts!
Neatly stored in the garage. I have threatened my children to keep them away from the parts. As you can see from where they park the bikes, the threat did not work.
9-18-2006, The slab for my work room was poured. Building to be up on 16OCT2006.
A Laser operated chain gun was ordered to help keep kids away. Beer frig ordered. Keg of Guinness ordered. Yup, things are looking good.
Everything is in the shop as of 11NOV2006