Utilities
Spring loaded with a
rachet, automatic take-up reels for both the water supply
hose and the 50amp electrical service cable certainly
simplify deployment for use and coiling for
storage!
Another view of the
utility reels. I added the foam around the edge of the door
to seal around the electric supply cord. Keeps things a
little cozier in the winter cold.
The propane
compartment has been cleaned up, re-floored, and insulated.
It looks like new!
The electrical control
center. Above the stool in the bathroom, the left side is AC
120 volt equipment and the right side is 12 volt. There are
breakers on everything and a master breaker at the top to
shut everything off. The AC voltmeter, DC ammeter, and a
voltmeter showing the coach battery voltage can all be
illuminated for viewing in the dark with the little
momentary rocker switch at the bottom. Clasco did themselves
proud with this installation.
This panel is above
the sink in the kitchen, just to the left of the entrance
door. On the left is the main lighting switch panel. On the
right, the "levels" gauges. In the center is the hour meter
for the Onan, start/stop controls, and a little red
pushbutton that I added for the prime circuit, to prime the
Onan before starting.
home
![]()
Olin and
Donna Boyer - Tulsa, Oklahoma





