·  Zenith Aircraft  ·  Cessna Aircraft  ·  Experimental Aircraft Assoc.  ·   ·  Home  · 

 Home  USA

Logs:
Fuselage (08/17/06)
Wings (03/09/02)
Horizontal (12/20/00)
Elevator (5/9/00)
Rudder (7/5/99)

Photos:
Paint (08/28/08)
2nd Taxi (06/28/08)
Airport (05/24/08)
Panel (05/24/08)
Engine Run (09/16/07)
Engine (09/16/07)
Canopy (08/17/06)
Ryan Building (03/26/05)
Dual Controls (11/18/04)
Main Gear (01/02/05)
Fuselage I (06/24/02)
Fuselage II (05/09/03)
Fuselage III (04/19/04)
Fuselage IV (06/19/04)
Fuselage V (01/02/05)
Fuselage VI (03/26/05)
Wings I (07/17/01)
Wings II (12/30/01)
Wings III (03/09/02)
Horizontal (12/20/00)
Elevator I (12/20/00)
Elevator II (12/20/00)
Rudder (12/5/99)
Misc (04/15/03)
 
Office (10/06/02)
Office II(12/03/02)
Office III(04/15/03)
 

Misc:
Helicopter Story
Skydiving Story
Scuba Diving Story
Skiing Story

Click for Wichita, KS Forcast

Certified Open Water Diver


Elevator

Here you see the doubler clecoed to the upper horn with 3 #20s. Top side of the elevator done! Well, to be honest, the skin doubler on the other side of the horn is supposed to be #20s. I ran out fo clecos so for now they are #30. I assure you that they will be #20s before any rivets are set! Here you see the elevator in its near final shape (from bottom, standing on its front flange). The rudder relief section has been cut out, but the recessed trim tab has not yet been cut. See construction logs for why not. Here is where you see the difference noted in the second picture. My trim tab is recessed instead of hanging off the back of the elevator.
This shows the trim tab linkage as well as part of the access panel cutout. The cutout for the linkage will be filed slightly larger than you see here for fine-tuning the clearances. Here it is!!! The closed (mostly) elevator! Isn't it beautiful?!? Before you judge, you builders can't say that you don't do this too! Now where did I put the rest of that airplane?!? I just realized that I didn't have a photo of the complete horizontal and elevator. Now I do.
 
Images and comments in the construction and photo logs are not intended to provide technical reference to other builders.