The hard working 44 tonner with load. Built for track maintenance, she has
far exceeded all expectations. The handheld control is on the cab roof.
-->Click on a thumbnail to view a larger image.<--
|
|
|
|
|
|
|
Front showing provision for moving left wheel out 1/4" to achieve 7-1/4" or 7-1/2" gauge operation. |
|
|
|
|
|
|
|
|
|
|
|
|
Shows individual pieces of aluminum screwed or pop-riveted together to form body. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Main side plates are 1/2" steel, equalizers are 1/4" steel, journal boxes are aluminum, steel wheels hogged from solid billet, and springing. |
|
|
|
|
|
|
|
|
|
|
|
|
Remove bolts on right hand side, insert two half circles of 1/4" brass as spacers and retighten bolts. This changes the gauge from 7-1/4" to 7-1/2". |
|
|
|
|
|
|
|
|
|
|